GANS are experienced in taking over responsibility of complete ATC facilities at new locations and commissioning them for ATC operations
Taking over and startup of ATC operations at new location #1
Taking over and startup of ATC operations at new location #2
The installation of the TTLS and LAMS Systems was performed by GANS Engineering under supervision of manufacturers supervisor. Since this installation GANS Engineering have successfully installed a TTLS at a remote location unsupervised.
Taking over and startup of ATC operations at two new facilities
Provision of ATC at a green field site #1 through the deployment of the following:
Following this, a permanent ATC Tower was built. GANS then took over responsibility for the systems installed in the ATC Tower including VCCS, Radio Systems and Recording System. The TTLS controller working position was relocated to the permanent ATC Tower.Provision of ATC at a green field site #2 through the deployment of a mobile ATC Tower and the takeover of complete CAT II AGL Systems, two CAT II ILS/DME Systems, Aircraft Arresting Gear Systems. This included the installation of the AGL, ILS, Arresting Gear control systems and the MET System display in the mobile ATC Tower with associated cabling and civil works.
We Know the Importance of Delivering the Best Customer Experience.