Project References

Commissioning Air Traffic Control Towers

GANS are experienced in taking over responsibility of complete ATC facilities at new locations and commissioning them for ATC operations

Taking over and startup of ATC operations at new location #1

  • Delivered all ATC systems which included: VCCS, Radio System, Recording & Replay System, Consoles, Complete CAT II AGL Systems, Two CAT II ILS/DME Systems, DVOR, TACAN, NDB, Aircraft Arresting Gear Systems, etc. Included attendance at Site
  • Transition and Acceptance tests
  • Installation and commissioning of TTLS System
  • Installation and commissioning of Operational Information Display System (OIDS)

Taking over and startup of ATC operations at new location #2

  • Delivered all ATC systems which included: VCCS, Radio System, Recording & Replay System, Consoles, solar-powered AGL System, etc. Included attendance at Site Acceptance Tests
  • Installation and commissioning of two TTLS Systems, including design and inspection of civil works and provision of commissioning flight checks
  • Installation and commissioning of LAMS (Local Area Mulitlateration System), including design and inspection of civil works
  • Installation and commissioning of mobile aircraft arresting gear systems, including design and inspection of civil works
  • Installation and commissioning of OIDS

The installation of the TTLS and LAMS Systems was performed by GANS Engineering under supervision of manufacturers supervisor. Since this installation GANS Engineering have successfully installed a TTLS at a remote location unsupervised.

Taking over and startup of ATC operations at two new facilities

Provision of ATC at a green field site #1 through the deployment of the following:

  • A Mobile ATC Tower with full communications capability
  • Installation, commissioning and maintenance of a TTLS (Transportable Transponder Landing System)
  • Installation, commissioning and maintenance of a portable TACAN
  • Installation, commissioning and maintenance of solar-powered AGL Systems
  • Installation, commissioning and maintenance of Aircraft Arresting Gear Systems

Following this, a permanent ATC Tower was built. GANS then took over responsibility for the systems installed in the ATC Tower including VCCS, Radio Systems and Recording System. The TTLS controller working position was relocated to the permanent ATC Tower.Provision of ATC at a green field site #2 through the deployment of a mobile ATC Tower and the takeover of complete CAT II AGL Systems, two CAT II ILS/DME Systems, Aircraft Arresting Gear Systems. This included the installation of the AGL, ILS, Arresting Gear control systems and the MET System display in the mobile ATC Tower with associated cabling and civil works.